Silouette graphic representing Tipperary

Roads and Transport - Latest News

Featured

Intention To Close Roads To Facilitate Quest Lough Derg 2024

TEMPORARY CLOSING OF ROAD
ROADS ACT, 1993-2015,
(SECTION 75 OF THE ROADS ACT 1993)
ROADS REGULATIONS, 1994
INTENTION TO CLOSE ROADS TO FACILITATE QUEST LOUGH DERG 2024
NOTICE is hereby given that Tipperary County Council proposes to make an Order closing:
ROAD TO
BE CLOSED Closure 1: The L-6090-0 Lakeshore Drive, Ballina, Including parking spaces adjacent to Flanagan’s on the Lake

Closure 2: Graves of the Leinster Men, Ballina, Road from Derrybeg to Cloneybrien to Cooneen.
L6036-0, L2136-26, L2136-0 and the L2136-10 and the L2136-21

PERIOD OF
CLOSURE: Closure 1: Ballina
From 06:00hrs to 18:00hrs on Saturday 21 September 2024.
Closure 2: Graves of the Leinster Men Road
From 06:00hrs to 13:00hrs on Saturday 21 September 2024.
ALTERNATIVE
ROUTES: Closure 1: Ballina
full access to the Lakeside hotel will be available via the L-6090-0 from 11.00hrs onwards from the R494-31.
Closure 2: Graves of the Leinster Men Road
via the Grange Road / Curraghvilla the L2130-0/15 or Legane / Killary the L6035-0 / 18 or Cloneybrien the L6038-0.

REASON FOR CLOSURE: To facilitate the Quest Lough Derg Event.

Objections to the proposed temporary closure may be submitted in writing to Road Closures, Roads & Transportation, Tipperary County Council, Civic Offices, Limerick Road, Nenagh not later than 12 noon on Thursday 29 August 2024 or by e-mail to roadclosures@tipperarycoco.ie

21 August 2024

Temporary Traffic Management on the L-2301-1 Kilkennybeg, Co.Tipperary

Temporary Traffic Management on the L-2301-1 Kilkennybeg, Co.Tipperary.
From the 21 August 2024 to the 23 August 2024 for Drainage Works.
From 07.00hrs to 19.00hrs for the duration of the works.
Local access will be maintained and Diversions will be in place as the works progress.

20 August 2024

Temporary Traffic Management on the L-6123-0 Cappagh to Jessfield

Temporary Traffic Management on the L-6123-0 Cappagh to Jessfield, Co.Tipperary.
From the 21 August 2024 to the 22 of August 2024 for surface dressing works.
From 07.00hrs to 19.00hrs for the duration of the works.
Local access will be maintained and Diversions will be in place as the works progress

20 August 2024

Google Traffic Map

Current Road Congestion
Clonmel Nenagh Thurles Cashel
Clonmel Traffic Flow Nenagh Traffic Flow Thurles Traffic Flow Cashel Traffic Flow
 
Carrick-On-Suir Cahir Tipperary Town Twomileborris
Carrick-on-suir Traffic Flow Cahir Traffic Flow Tipperary Town Traffic Flow Two-mile-borris Traffic Flow

TII Cameras

M7 Nenagh N8 Two Mile Borris M8 Cahir N24 Clonmel Relief Rd
holdingimage holdingimage holdingimage holdingimage

Disclaimer: All images displayed are being generated by https://www.tiitraffic.ie/ traffic camera feed